| Delnote
Constructions required support in the construction of
a waste-water clarifier tank. This involved the construction
of one tank inside another. The smaller tank has the radius
of 6.9m. The larger tank has a radius of 14.7m. Both tanks
have the same wall height of 4.8m, which was catered for
by using 2 x 2.4m Reflex panels.
The smaller tank was constructed in
two pours, where half of the tank was poured, then the
Reflex was stripped and used on the second half of the
tank. The same forms were then used on the larger tank
in 4 pours.
Delnote Constructions elected to use
RMD on this project because Reflex provides significantly
improved on-site productivity and improved labor costs.
Also Delnote had previous favourable experiences working
with RMD Adelaide.
|