logo: RMD Australia  
  photo: bridges and aquaducts - heavy duty propping and rapidshor shoring
 

Project > Bridges > Twin Bridges Over Princes Highway

Bridges
 
LOCATION: Princes Highway, Flinders, NSW
CLIENT: Fulton Hogan
   

In their design brief for the Twin Bridges project Fulton Hogan had a number of challenges to overcome. They needed a falsework system to support not only the soffit of the bridge but also the formwork which is needed to cast the wings.

They also required a captive deck system as part of their shoring requirements. The RMD Rapidshor shoring system provided this requirement with its new, safe, captive deck system, it worked very successfully on the Twin Bridges project.

Other products used on this project were the Alshor Plus, latest generation shoring system, Rapidstage for access and Super Slim Soldiers – the definitive primary beam.

With the help of RMD’s state of the art products and the support of the RMD design team the challenges were overcome. A new design system was used which provided the client with drawings showing views of each row of legs from both angles. This helped in the product erection and for checking, as well as eliminating any mistakes due to incorrect reading of the drawings.

 

 
Twin Bridges, NSW

Project Photo:
Twin Bridges
Over Princes Highway
Flinders, NSW