| |
|
| LOCATION: |
Brisbane,
Queensland. |
| CLIENT: |
Leighton
Construction Pty. Ltd. |
| |
|
| This 4.5
km transport route has removed 25% of traffic from city
and valley.
Three RMD products were used throughout the project. Megashor
was chosen as an ultra high-duty modular propping system.
The Rapidshor system was utilized because it provides
high load shoring that is strong and versatile and can
be quickly and easily assembled. Strongshor was selected
as a heavy duty shoring system that cuts costs and time
because it has fewer components than other products.
Other RMD products used were Rapid Ply, Super Slim Soldiers
and Minima panels. |
|
|
Project Photo:
Brisbane Inner City Bypass,
Brisbane QLD.
|
|